Greenbank Building
Inspections

Stage inspections and the QBCC Standards and Tolerances Guide

Builders must meet the guide when fixing work, but not all defects are a breach.

Greenbank 4124 · 22 October 2026

Fully licensed & accredited

  • Queensland Building & Construction Commission Queensland Building & Construction Commission
  • Australian Society of Building Consultants Australian Society of Building Consultants
  • Strata Community Association Strata Community Association
  • Building Dispute Practitioners Society Building Dispute Practitioners Society

In short: A Greenbank build had cracks that were fixed but did not meet the guide.

Why the guide matters

The QBCC Standards and Tolerances Guide sets the limits for workmanship. If the guide is not met, the work is not up to standard.

What the guide says

It lists specific measurements for cracking, waterproofing and finishes. The guide applies to all work, whether it is wet or dry.

What we found

We inspected a Greenbank home where cracks appeared on the plaster. The builder filled the cracks, but the joint was still wider than the guide allows.

How we report it

We measure the joint against the guide and note the difference. This provides a record of what was not done, even if the builder fixed the crack.

What to do

Ask the builder to refer to the guide and get the item rectified. A handover inspection is too late to change the standard.

Written by our local inspection team from work carried out in Greenbank. Licensed building practitioners.

Guides

More new construction stage inspections guides for Greenbank

All guides →

Book a building inspection in Greenbank

Instant online pricing for Greenbank, or contact the booking team.

FAQ

Questions Greenbank owners ask about this

Can I accept the crack anyway?

You can sign off, but you lose the right to complain later. The guide is a public standard.

Is the builder allowed to fix it?

Fixing a defect is required, but the fix must meet the guide. A bad fix is still a defect.

Does the certifier sign this?

They look at the building as a whole. They do not measure every joint.

What if the engineer approved it?

The engineer's approval does not override the guide. The guide is the baseline for all work.